Skip to content
Brampton, Ontario · Bathrooms

Brampton bathroom permit: when you need one and what to submit

The short answer

Adding new plumbing fixtures or changing existing plumbing needs a permit. New cupboards with no plumbing changes don't. City fee: $326.21.

Last verified 2026-10-07 · City of Brampton: New plumbing fixtures permit package (PDF), City of Brampton: 2026 permit fee schedule (PDF)
City fee
$326.21
Review time
The City's standard service reviews home renovation permits in 10 business days.

What an application usually includes

Brampton’s checklist has the exact list; apply through Brampton Building and Business Portal.

  • A plumbing layout: fixtures, drains, vents and the tie-in to the stack
  • The fixture count for the fee
  • A floor plan if walls or openings change

Local quirks

  • Two zoning by-laws apply right now (270-2004 and the new 14-2026, which is under appeal), and the stricter rule wins. Check both for fences and deck setbacks.
  • A pool needs paperwork before digging: Alectra Utilities stamps the site plan first, and fill or road occupancy permits may apply.

Design your Brampton bathroom to the Building Code.

The design, drawings and code checks work in Brampton today. Brampton’s own forms aren’t built in yet, so you’ll fill those in on the City’s portal.